Start-up / Commissioning | August 2019 |
---|---|
Capacity | 900 Nm³/hr raw biogas 600 Nm³/hr biomethane |
Methane concentration in raw biogas | 60% |
Methane concentration in product gas | 89% (Dutch low-calorific gas, L-gas) |
Efficiency | 99,5% |
Type installation | PurePac Grand |
Den Hoorn, Netherlands
Bright Biomethane has built a biogas upgrading installation at the largest wastewater treatment plant in the Netherlands, one of the largest in Europe, situated in Den Hoorn.
This is Bright Biomethane’s second installation for the same client. This versatile installation makes use of an innovative pretreatment system which delivers biogas to several processing systems – the biogas upgrading system, existing CHP and boiler, interchangeably or at the same time.
By utilizing the upgrading system, the biogas is upgraded to biomethane with capacity of 900 Nm3/hr. The produced biomethane is injected into the gas grid. Instead of low-calorific biomethane (L-gas), high-calorific biomethane (H-gas) can be also produced in the near future.