Start-up / Commissioning | Pending |
---|---|
Capacity | 500 Nm³/hr raw biogas 280 Nm³/hr biomethane |
Methane concentration in raw biogas | 55-62% |
Methane concentration in product gas | > 97% |
Efficiency | > 99,5% |
Type installation | PurePac Medium |
Dunsfold, England
Bright Biomethane will soon start the commissioning of the biogas upgrading installation in Dunsfold, England.
The installation is located adjacent to anaerobic digestion (AD) plant, which generates 500 Nm3 /hr biogas from supermarket food waste. Once operational, the upgrading installation will produce 280 Nm3/hr and 2.4 million Nm3 annually, which will be used for injection into the national gas grid, sufficient for keeping roughly 2200 British families warm.
This PurePac Medium installation comes in a 40 ft container, including membrane filtration modules, control panel and a biogas analysis system. Active carbon filters, cooling skid and a compressor are placed outside the container. The installation can be in the future extended with a liquification system to produce food grade quality CO2.