Completed
Start-up / CommissioningPending
Capacity500 Nm³/hr raw biogas
280 Nm³/hr biomethane
Methane concentration in raw biogas55-62%
Methane concentration in product gas> 97%

Efficiency> 99,5%
Type installationPurePac Medium

Dunsfold, England

Bright Biomethane will soon start the commissioning of the biogas upgrading installation in Dunsfold, England.

The installation is located adjacent to anaerobic digestion (AD) plant, which generates 500 Nm3 /hr biogas from supermarket food waste. Once operational, the upgrading installation will produce 280 Nm3/hr and 2.4 million Nm3 annually, which will be used for injection into the national gas grid, sufficient for keeping roughly 2200 British families warm.

This PurePac Medium installation comes in a 40 ft container, including membrane filtration modules, control panel and a biogas analysis system. Active carbon filters, cooling skid and a compressor are placed outside the container. The installation can be in the future extended with a liquification system to produce food grade quality CO2.